top of page

PROJECTS

Bamboo Football Pitch Km.42 School

3rd construction project with the Canadian organisation CASIRA. The aim was to build two classroom for 20 & 28 students. The overall budget available for this project was 4800 Canadian$.

 

The classrooms will be ready to use by mid January. To reduce the noise and to achieve a better air circulation, we separated the classrooms by introducing a covered walkway between them. This will have a positive impact on the learning environment.

-Lead Designer: Jan Glasmeier, Cristoph Mueller, Sarah Piontek

-Location: Phop Pra, Thailand

-Project Year: 2014

-Collaborators: Colabora Birmania, Clara Schaeper, Ironwood.

-Budget: 1000 USD

-Photographs Franc Pallares, Sarah Piontek

bottom of page